The loading of the coal at Rio Fiorita has been much delayed and the train could leave the facility only a few minutes before the sun disapeared behind the mountains.
Between Ing. Paz Ferreira and Rio Fiorita the grade of the line is quite severe and the Santa Fe #205-7M has to work very hard to bring an empty coal train to the loading station.