NS 213 eases up to a stop signal at Five Row as P61 clears the plant at Spencer and Rowan. Most would consider the huge pile of discarded ties along the right of way as clutter in the way of a goo... (more)
The Alaska Railroad dispatched a "snow fleet" work extra consisting of two GP40-2s pushing Harsco/Jordan Spreader 9 south to Portage to begin opening up the railroad to Seward. The sout... (more)
New rail laid on track two between Kannapolis and Haydock, this particular section located near the "Glass" intermediates near the 351 MP.
136= 136 lb/yd rail
RE= Rail manufactured t... (more)