CLF4-44223-C501-4908-852 with a loaded SSR grain train from NSW to Appleton Dock cross the Jacana flyover.
P14-EV120-P16 on an infrastructure evaluation run from Sandringham pass through Hampton Station.
P16-EV120-P14 returning from an infrastructure evaluation run to Mernda at West Richmond.
P16-T395-T356 with an SSR works train near Macleod.
42103-S303-CLF1 shunt at Appleton Dock.
P14-EV120-T386 returning from an infrastructure evaluation run to Carrum approach Caulfield.
Streamliners 42103-GM10 work the AK test train to Maroona towards Altona Junction.
P14-EV120-T386 returning from an infrastructure evaluation run to Cranbourne at Oakleigh.
P17 and T386 running in push pull mode pass through Albion Junction with a rail train from the McIntyre Sidings.
CLF1 stabled with a rake of new SSR BGUY grain wagons at Appleton Dock.
CLF1-C501-CLF2 with 2MC5 empty SSR grain to NSW at Albion.
T381 leading an SSR works train from Warragul passes through South Kensington.
P17-T356-T381 with an SSR works train at Ascot Vale.
CF4403-CF4410-8030 with 3MS7 Qube cement train passes a stabled SSR grain consist led by CLF1-S311-CLF4-CLF2 at Appleton Dock.
CLF1-S311-CLF4-CLF2 stabled with an SSR grain consist at Appleton Dock.