Drivers view on the Jungfrau Railway, entering the Eismeer crossing station on 3158 meter a.s.l., deep inside the Eiger mountain, when coming from the Jungfraujoch, top of Europe. The gauge is 1 m... (more)
First Train, First Day. It would be hard to tell exactly how long the planning for MTA LIRR East Side Access (ESA)/Grand Central Madison (GCM) has been ongoing, but it's safe to say it has ... (more)
On the Tracks. The EA for B&O, along with the E1 for Santa Fe and the E2 for UP, was part of EMC's first streamlined passenger diesels designed to operate as standalone units versus the pr... (more)
An MBTA F40PH-3C shoves east out of Back Bay station during rush hour. It is also the blue hour, as seen through the opening in the station roof. The station includes signage (one example is see... (more)