A busy day at Pitcairn!
GP15's on a stack train? Well yes and no. The GP15's were power off of the local. Part of thier duties is to switch cars at Pitcairn Yard. Today NS uses two GP38-2's for this job, and they are b... (more)
A Stack train prepares to depart west from Pitcairn Yard.
A cold winter day. Don't let the sunlight fool you.
Ohio Centrial was leasing this old SD9 to power a fiber optic cable laying train. Note the second car in the train is the trench digger and is made from a former ATSF G.E. C-30-7 frame and truck... (more)
Two Conrail SD60's haul a loaded coal train east in the last light of the day.
A work train departs Pitcairn Yard at 7:45am in the morning fog.
A helper set shoves a mixed freight east as a westbound coal train waits on 98 track.
Two big EMDs back into Pitcairn Intermodal Yard to pick up their train. The locomotives ran light from Conway Diesel Terminal.
A Locomotive Management Services unit (a Conrail and G.E subsidiary) leads an eastbound trailer train up grade at Wall, PA. The LMS units worked 6 months on Conrail and 6 months out on lease for ... (more)
A helper set returns west to Pittsburgh while being bathed in setting sun.
A Stack train rolls past Pitcairn intermodal yard.
Signs that autumn is coming, as this empty coal train passes the town of Pitcairn.