On the PSAP railroad a conductor returns to the pool power after setting out a cut of empties at Bayshore Siding. In a few moments they will receive an order to proceed north toward Belfair .
Another trip up the hill and the rear helpers separate. The 1200 continues with the log train into the property while the 1202 waits behind with a mud load at the Hanks Lake Road crossing.
Keeping the logging trucks off the streets of downtown Shelton, another trainload of logs passes Knights siding and is moments away from entering the Simpson Timber Company mill complex on the Oak... (more)
Simpson Timber Railroad SW1200's # 1201 & # 1200 exchange empties for loads at the Dayton Dry Sort Yard about 10 miles west of Shelton, WA. You may have heard rumors that it rains often in wester... (more)
Simpson Timber SW1200 # 1201 shuffles empty log bunks within the sprawling mill complex in Shelton, WA. Picture taken on mill property with permission.