Trestle loading test over Monroe Avenue before opening to public service. Four ALCos together w/ 80 Ton. each: #D667,# D657, #D658 and #D651
Locomotive EMD G22 CU during an overhaul process at Tapiales Workshops
Empty train Catched just at the top of the bridge, climbing at notch 8 from Isla Talavera to Zarate Intermodal station. This suspended metal and concrete structure was finished in 1978, crossing P... (more)
Passenger train from Tucumán destination Buenos Aires.
Mounting the sliding beams that will be used to put here the molded boards of the future trestle, which is partially done! Also the tracks were temporary moved to the left to allow working in this... (more)