The austrian railways ÖBB ordered 18 new fire fighting and rescue trains from StadlerRail for the infrastructure department. The first built train X122 # 001 (99 81 9173 007-1) is on a test run 3... (more)
The Arlberg line in Austria, between Ötztal and Bludenz, has been closed for engineering works from october 9 to november 6. For the day trains, there is a bus substitute installed. The NightJet ... (more)
The Arlberg line in Austria, between Ötztal and Bludenz, has been closed for engineering works from october 9 to november 6. For the day trains, there is a bus substitute installed. The NightJet ... (more)