Even the in the pouring rain, the engineer of E9A 101 gives a friendly wave as the Santa Train whips through CP Andersonville on the CN (former GTW) Holly Subdivision.
IC 1028 leads the CN L509 to Morris for some switching work. A DAIR GP9 will be set out at Motive Power Resources in Minooka Illinois further down the line.
IC 1028 leads the CN L509 to Morris for some switching work. A DAIR GP9 will be set out at Motive Power Resources in Minooka Illinois further down the line.