Hunslet Saddletank No 7 performs at Wheldale Colliery. This engine was pressed into use for 3 weeks in 12/81 when severe weather froze this systems Sentinel diesels.
Hunslet Saddletank No 7 performs at Wheldale Colliery. This engine was pressed into use for 3 weeks in 12/82 when severe weather froze this systems Sentinel diesels, one of which is visble here.
Hunslet Saddletank No 7 performs at Wheldale Colliery. This engine was pressed into use for 3 weeks in 12/82 when severe weather froze this systems diesels. See EXIF data for full caption.
Hunslet Saddletank No 7 performs at Wheldale Colliery. This engine was pressed into use for 3 weeks in 12/82 when severe weather froze this systems diesels. In the foreground is stacked NG track p... (more)