NS 264 races thru Darien Center
BNSF 8460 (SD70ACe) pulls into the Denver Yard with snow on its face from a heavy snowfall along the Colorado Front Range.
Heavy snow has frosted BNSF 8460 (SD70ACe) as it brings an empty coal train into the Denver Yard.
A frosty BNSF 8460 (SD70ACe) leads an empty coal train under the Park Avenue Viaduct in Denver, Colorado as it heads to the downtown BNSF yard.
BNSF 8460 starts its long climb up the Cascade Mountains on a July summer evening.
The new year resets the train counts in the coal train symbols on the BNSF. The 1st loaded train of 2021 for Rush Tower, MO, (RTR"001") for Union Electric is eastbound on the Ottumwa Sub... (more)
A long coal train makes the slow journey through the grasslands between Greenland and Palmer Lake, Colorado, The elevation change in this stretch is 571 feet, sometimes requiring helper engines to... (more)
BNSF 8460 (SD70ACe) climbs over a stone archway on its way to Palmer Lake, Colorado.
Q-NYCLAC6 splits the searchlights at Atwood as they near their destination at Hobart.