A view peering down the Matapihi railway bridge from the Tauranga side, as DXR8007 approaches from the eastern end. This image was captured from the walkway on the southern side of the bridge, on ... (more)
Rebuilt KiwiRail General Electric C30-7M locomotive, DXR8007, leads northbound freight MP12 from Mount Maunganui at Whangarata (between Huntly and Pukekohe).
A Toll freight train heads to the Port of Tauranga over the Tauranga Harbour Bridge with a train load of empties to pick up extra containers going to Auckland.
A Toll freight train heads to the Port of Tauranga with a train load of empties as it passes a North bound freight that is waiting to enter the Southern portal of the Kaimai tunnel.