L3108 & LZ3117 work their loaded iron ore train through Naval Base nearing the port of Kwinana to unload. During Aurizon's 3 year stint of working these iron ore trains for Mineral Resources, it w... (more)
The first portion of the loaded Polaris/MRL iron ore train, 1030, is worked hard upgrade by L3108 & LZ3117 through Thornlie in suburban Perth. This 64 wagon length train was originally 116 wagons ... (more)