NECR yard power is seen parked for the weekend in Palmer. The 417 was built for the Florida East Coast in October of 1974.
NECR 608 heads back towards Willimantic Waste after dropping off cars for Providence and Worcester.
At Windsor Locks, Connecticut Southern CSO-4 passes the former New Haven Railroad station which was built in 1875.
Connecticut Southern CSO-4 with NECR GP40-2 417 and GP38-2 2048 are close to the Warehouse Point Railroad Bridge. They will cross the Connecticut River on the way back to Hartford.
On their northbound run to Springfield they had Connecticut Southern GP40-2 3771 as the third unit. The southbound run back to Hartford is about to cross the Warehouse Point Railroad Bridge. Forme... (more)
NECR 417 followed by NECR GP38-2 2048 heading over the Farmington River Railroad Bridge.The loaded trash and empties mixed train headed to Springfield.
A former Florida East Coast GP40-2 is on the point of Connecticut Southern CSO-4 in Enfield. The train is returning to Hartford, after picking up cars at CSX’s West Springfield yard.
Connecticut Southern CSO-4 in Windsor, CT.
CSO-4 crosses the Connecticut River in Enfield as it heads for CSX's West Springfield yard.
New England Central GP40-2 417 brings a short CSO-3 south through Windsor, after switching Babylon Recycling in Suffield.
The Ringling Brothers, Barnum & Bailey Circus Blue Unit train arrives in Hartford from Providence.
Connecticut Southern train CSO-4 departs Springfield for its short trip south to Hartford with a New England Central GP40-2 leading a Connecticut Southern SD40-2 and 37 cars from their interchange... (more)
NECR 417 through an arc at the Winooski Overlook