At sunset, an eastbound WP manifest with four pooled UP SD40-2s for power, roars through the sweeping curve at El Pinal as it approaches the crossing of SP's Valley Line. The engineer appears to h... (more)
With a quartet of UP SD40-2s for pool power, a train headed for Ogden has the throttle in Run 8 at El Pinal.