UP 7280 has its westbound train, mostly sand loads, up to about 50 mph as it rolls under US 12's bridge and around a slight curve at Boundary Rd, just east of Woodville, WI. This is the location t... (more)
UP 7280 rolls its train through fills and cuts on the old C&NW route of the 400 as it is about to pass under highway 128 west of Wilson, WI. The wide cut gives away the fact that this was a double... (more)
UP 7280 has topped Knapp hill and picks up a bit of speed as it approaches the 310th St. crossing at Wilson, WI on its run from Altoona to the Twin Cities.
UP 7280 heads a westbound train up Knapp hill just west of Knapp, WI. The train is down to about 20 mph with heavy sand loads supported by 3 GEs on the point and 2 more on the back as DPUs. Part o... (more)
UP 7280 leads this westbound MNPWC at Daggett where it will join BNSF rails.
Empty KCS coal north bound
This is a westbound coal train, headed for the Reid Gardner power plant in nearby Moapa.
Green signal....throttle up!