The DX class was built by General Electric's Erie, PA plant and entered service from 1972. From 1988 the DX class received a series of modifications and, with new motors and Brightstar fitted, wer... (more)
SP 4449, The Daylight, leads the Portland-Bend excursion south over the massive Madras, OR bridge.
SP 4449, The Daylight, leads the Portland-Bend excursion south through Maupin, OR along the Deschutes River.
4449 leaves the Fallbridge Sub and heads down the Oregon Trunk during the Bend Excursion.
The Bend bound SP excursion exits one of the tunnels in Cooks, WA after a late start out of Portland.
After a late start, SP 4449 really picks up the speed as it passes wildflowers of the Colombia River Gorge.
PRR Heritage Unit on former Reading trackage through Harrisburg, PA.
PRR Heritage Unit on former PRR trackage through Shippensburg, PA.Taken at the Possum Hollow Rd grade crossing.
On former PRR trackage The PRR heritage unit leads a 925 train to Greencastle, PA. It's hauling ballast from Birdsboro, PA which will be dumped at new intermodal yard.
DFT7117 heads up southbound 925 freight in Middleton Yard (Christchurch), awaiting departure for Dunedin.
The first train on the derailment scene in Waterloo is the NS Ballast train. As 925 creeps into the work zone, an NS Tie truck prepares to unload track material for the repairs.
Hulcher Professional Service & NS track workers set track panels into place on main two as the ballast train prepares to dump rock on main one.
A work train pulls through the work zone after dumping rock on Main One in Waterloo. Track Panels for Main Two are staged to for installation.
The Ballast Train dumps rock on Main One as crews set panels on Main Two as track repairs continue after a large coal train derailment in Waterloo.