After crossing the Tennessee River, the 9,800ft long CSX Q210-01 (Cayce,SC-Smyrna,TN) is now south of the downtown Bridgeport, AL. The empties will pick up the pace and cruise down the main 2 trac... (more)
After the southbound CSX Q237-01 slowly make it's way south out of Stevenson, AL (MP J-112.8 Stevenson) on the main 1 track, CSX Q210-01 (Cayce,SC-Smyrna,TN) receive a signal, slowly creeps north ... (more)
In a matter of 3, and a half hour with only one stop in Sherwood, TN since it's departure at Wauhatchie, CSX Q210-22 ( Cayce,SC-Smyrna,TN) is now making it's 1,400ft decent down the Cumberland Pla... (more)
Veteran Engineer Mr. Bray (now retired) poses for the camera as he "pop the clutch," and get the northbound CSX Q210-04 (Dixiana,SC-Louisville,KY) underway for the Wauhatchie Yard lead at Lookout ... (more)
The Big Six
Running at track speed on the main 1 track, CSX Q210-04 (Dixiana,SC-Louisville,KY) is on the outskirts of Stevenson, AL (MP J-116.2) working it's way north for Nashvi... (more)