An empty limestone train bound for loading at Mount Vernon exits tunnel #7 between Hazel Patch and Bernstadt on Crooked Hill. This train will get off the CC Sub at Sinks for the 9 mile travel up a... (more)
The CSXT has a limestone loader on the ex-L&N mainline west of Sinks, KY, off the CC Sub. The CSXT use 9 miles off this ex-mainline to access this loader on the west side of Mount Vernon. Here an ... (more)