It has been six days since the derailment on the CSXT Mohawk Sub and crews are still hard at work cleaning up the mess. The derailment, which involved the Q364 and the Q641, occurred shortly befor... (more)
The engineer notches up as he pulls off the Belle Isle Siding at CP 293 after allowing the Q382 to pass on the main. Directly behind the engines was yet another wind turbine, a sight that was fair... (more)