As always, the public turns out en masse for the San Bernardino Railroad Days, when the star of the show is former Atchison Topeka & Santa Fe Railway 4-8-4 3751, owned by the San Bernardino Railro... (more)
As BNSF train Q-RICCHI6-08 (with BNSF Dash 9-44CWs 5215 and 683, along with KCS AC4400CW 4598 – and two more Dash 9-44CWs shoving on the rear: BNSF 5004 and 4960 – for power) climbs the Tehach... (more)
BNSF Railway train S-LHALPC2-23W (Intermodal Stacks, Los Angeles Harbor Pier 400 CA to Logistic Park Chicago IL) has completed its run on the Railway’s La Junta Sub and is crossing over onto the... (more)
After departing Los Angeles, Amtrak train 4, the eastbound Southwest Chief, arrived at its first stop, Fullerton, 20 minutes behind schedule. But this allowed the setting sun, which had be... (more)
After holding on Track 2 for a pair of passenger trains to stop at the Fullerton Transportation Center (a Metrolink commuter train on Track 3, and an Amtrak Pacific Surfliner on Track 1). ... (more)