Uintah Railway Lives
Okay, Soooo it is not the Uintah Railway. However the former Baldwin logging 2-6-6-2 climbing a 6% grade is as close as you can get to experiencing a Uintah Mallet.... (more)
On the return trip from South Amana during its final run, the crew and passengers take lunch at Brooklyn which also allowed for a meet with the eastbound road freight CBBI. After about an hour in ... (more)
The Beauty of the Narrow Gauge Eureka & Palisade 4-4-0 "Eureka" and Carson & Tahoe Lumber & Fluming 2-6-0 "Glenbrook" (both built by Baldwin in 1875) roll through the Lo... (more)
Rounding Windy Point The fireman aboard C&TS 484 has the 2-8-2 hot with a clean stack as the daily train between Chama and Osier comes around Windy Point on the last leg of the trip to Cumb... (more)