Coming down the hill north of Butler, three Bessemer workhorses have 70+ loads of iron ore at the drawbar as they come under an ancient searchlight cantilever.
After being skunked by the BLE and actually NS CSX and GE all day the Bessemer finally runs south in the late afternoon with a 5 unit light power move. The last 2 engines are a pair of CSX wide bo... (more)
After delivering 76 loads of ore to the Union RR at North Bessemer, three B&LE Tunnelmotors shove a CN Boxcars over the Allegheny River Bridge for the Industrial Track.