Nobody's home. 910 waits at Filer South for a re-crew.
A sign every respectable railfan should obey. BLE 910 South awaits a re-crew at Filer South before continuing to North Bessemer and contributer Bryan Bell shooting it meeting with the Unio... (more)
Its a beautiful day for railfanning in North Bessemer! The Bessemer has just pulled in with a heavy train of iron ore pellets as the Union railroad awaits departure.
A southbound holds the siding as this northbound rolls on by.
3 Tunnel motors pulling past a coal train they are picking up after the brakemen connected on the fred light.
Brakeman walks back up to 910 after flipping a switch.
After dropping off a string of cars 901 North is now ready to head back up to Butler light power
Two SD40T-3's pull in North Bessemer with scrap brought down from Butler.
Builders Plate for the Proctor built EMD SD40T-3's. 900-906 were built by Boise 907-910 were built by Proctor. To see Boise builders plate go here http://railpictures.net/viewphoto.php?id=109959
A trio of tunnel motors make there way through North Bessemer to do a brake test.
A trio of SD40T-3's seen waiting for thier conductor so they can pull out of North Bessemer.
910 has just brought an ore train across the massive Allegheny River bridge and will soon be entering North Bessemer.
Three tunnelmotors lug a loaded ore train into North Bessemer where it will be interchanged to the Union Railroad.
Only CN knows how long this railroad will survive. So far there has been more rail traffic than when it was owned by GLTX.