DM&IR 212 and DM&IR 403 come down the CN Rainy Sub light power after spotting gondola loads to be interchanged with CN. DM&IR 212 still sports a clean paint job mostly because of it's lack of use... (more)
A trio of former Missabe units leads a southbound iron ore train. The three units, SD40-3's DM&IR 400 and 404 and the SD38-2 DM&IR 212, once wore the maroon and gold of the former Missabe. Now i... (more)
The last SD-M on the former Missabe fleet, DM&IR 308, leads an empty T-Bird back to Largo. The DM&IR 308 has now officially been retired from the active CN roster as of March 21st, 2009 bringing ... (more)
After leaving Arcelor Mittal's Minorca Mine, DM&IR 403 DM&IR 215 and I.C. 6255 and I.C. 6265 lead 130 loads of iron ore down CN's Missabe Subdivision and will head to Two Harbors, MN.
DMIR 215 and repainted DMIR 212 pull 96 loads of raw taconite out from under the coarse crusher load out at United Taconite on a cold sub-zero Minnesota morning.