Closely following 22A
The crew of NS 37Q prepares to tie their train down on track 5 in the Bristol Yard.
Plenty of power, not too many revenue cars
The 37Q tied down on track 6 in Bristol Yard with a former Conrail C40-8W in the lead.
With only a few trailing cars, train is only several minutes behind 22A.
A short NS 37Q streaks by the old N&W Train Station in Bristol, VA
The crew of 37Q gets a great view of the construction of a new US 340 bridge over Overall Creek.
NS 37Q rolls into Bristol with 2 Union Pacific Dyna Cats as the first 4 high and wide loads on the train.
NS 37Q takes siding 7 in the Bristol with 2 Union Pacific Dyna Cats as the first 4 high and wide loads on the train.
The entire train is in this frame as this very short NS 37Q heads East to Bristol
NS 37Q rolls past a clear at MP 402.7 at Wallace.
Slowing to take siding and await E.B. 23G
NS 37Q streaks form Virginia into Tennessee on its way West out of Bristol.
A grazing cow can't be disturbed by the passing of 37Q, led by an old GE C39-8 on the fall like morning
NS VA Division 37Q crew brings their train down track 7 in the Bristol yard to be tied down for a TN Central Division crew to take over later in the day.