The helpers on westbound 25Z enter the cut at Ardara, Pa.
The helpers on westbound 25Z roll through a winter wonderland at Ardara. The original PRR main line was located on the right of way now occupied by the highway.
After numberous breakdowns due to a brutal frigid air mass, the South Schenectady/Rotterdam local limps back to Selkirk Yard after a difficult sub-zero morning. Apparently these new GEO rebuilds... (more)
A pusher set rolls downgrade through Summerhill, passing under the PRR signal bridge.
It's Getting Cold Up HereThe first thick blanket of snow has fallen on the Altoona area, and NS is as busy as ever with extra intermodal traffic ahead of the holidays. This place ne... (more)
A helper set leans into an eastbound climbing up the West Slope.
NS 12G descends the Allegheny Mountains at AR. AR Tower is looking worse for wear and might be torn down in the future.
An NS SD40E and two other EMDs works Bison Yard in Buffalo, New York Locomotives:NS 6353 SD40ENS 5666 GP38-2NS 3390 SD40-2NS 5667 GP38-2NS 3394 SD40-2
Two sets of helpers help a loaded coal train around the
An eastbound intermodal gets a push from a pair of SD40E's at the summit of the eastbound grade passing the derelict AR Tower.
Heading up the hill with a coal train.
A helper set shoving on the rear of an eastbound splits the PT 258 signals on its way up the West Slope.
A quartet of EMDs shove on the end of a loaded coal train as fall colors peak on the mountain.
A double set of helpers shove on the rear of an eastbound coal train as it heads up the West Slope of the Alleghenies towards the summit at Gallitzin.