Tramway at Clermont-Ferrand: These tramways are leaded by the rail in the middle. The wheels are equipped with rubber tires. Now there is only one line (Les Vergnes - La Pardieu Gare, 14.2 km, 31 ... (more)
Their day's work done, Sumpter Valley 19 takes a drink while W. H. Eccles Lumber Co. 3 stands by. As the sun slipped to the horizon, we were treated to a brief display of Alpenglow on the nearby... (more)
On the 2'0" gauge Mulgrave Mill system Clyde HG-3R 0-6-0DH 19 passes under the 3'6" gauge Kuranda Railway with 19 ten tonne bins loaded with sugar cane from the Barron River.
Suspension Railway in Wuppertal from Vohwinkel to Oberbarmen leaves the terminal station for changing the direction. There is only one line with 20 stations