A quartet of SD40-2s leads a BNSF train eastward onto the Sunset Route at Tower 26. In a moment, the eastbound will cross over to Main 2 in front of the westbound KCS unit grain train in the dista... (more)
KCSM 4726 West waits for another train to clear so it can proceed on its long journey to the U.S.-Mexico border and beyond.
A long KCS unit grain train, with nearly 100 loaded "Belle-Hops" in consist, revs up at Englewood Yard as it proceeds west.
A heavy westbound manifest makes it way out onto Main Two from Centennial Yard and passes UP's small intermodal facility.
As a pair of freshly painted GP40s leads a transfer run out of Settegast Yard, a set of SD40-2s waits for a signal.
A pair of MPI GP20Ds lead a transfer freight south out of Settegast Yard.
A westbound KCS unit grain train passes the west end of Englewood Yard.
A pair of shovels move a piece of snap-track into place as part of the process of installing a second main track at the yard's east end.
As a track gang installs a second main track at the yard's east end, an SD40-2/slug/SD40-2 set of locomotives climbs the hump with a long train of hoppers and tank cars to be classified.
Two UP eastbounds slowly approach the east end of the yard where a track gang is working furiously to install a second main track through the limits of Tower 87.
A short UP manifest returns from a day of work in the refinery complex, with Lyondell Oil's refinery at left.
While a KCS unit grain train holds on Main One, PTRA and UP genset switchers work UP's intermodal facility just west of Englewood Yard.
With the Houston skyline looming in the distance, a UP track gang installs a second main track at the east end of Englewood Yard. C40-8 9085 is passing through the work area on the main, returning... (more)
The Sunset Ltd. turning into the sunrise.
Heading for New South Yard