New crossing signals have been installed in Windber but have yet to be cut in, so a cop still has to protect the crossing every a coal train rolls through town and today was no exception as C47 sl... (more)
Having plowed Track 1 at left the day before, the former Conrail Jordan/80MAC combination is just about done with its work on Track 2 as it rolls toward the bottom of the hill at Slope. Next up a ... (more)