CEFX 1034 leads 5 CP units and mixed goods train along the Mississippi River in Hastings.
CP 5966's engineer inspects a passing train under a full moonlit sky as he waits for the signal to continue on his journey west towards St. Paul. He would have to wait for at least 2 more eastboun... (more)
The Northern Lights shine over the frozen Mississippi River and the old Milwaukee Road lift bridge as a pair of Norfolk Southern engines haul tankers east.
SOO 2010 and CP 2216 are waiting for their next assignment outside the Hastings depot.
A sweet pair of Southern Belles lead CP 475 by East Hastings, headed west.
After getting its mid train DPU inspected at St. Paul, 298 heads East at Hastings. It is crossing the former Milwaukee Road lift bridge that crosses the Mississippi River here. Taken while off dut... (more)
Soo 4416 and CP 2228 are parked in the Hastings rail yard for the weekend. They will be taking MOW equipment to its next destination in the near future. This picture was taken just after midnight,... (more)
CP Rail north bound freight sets in the siding at Hastings with SD40-2 #6036 leading as the local power is parked for the night with a pair of ECO units.
Milwaukee Road Flavor The river subdivision wayfreight crosses the Mississippi River drawbridge at Hastings, Minnesota led by ICE 6101 & CP 5906. eThis train will meet a pair of Indiana Ra... (more)
CP 2216, Soo 2010 and a couple of auto carriers and hoppers idling outside the Hastings depot while the crew takes their supper break.
Some beavers are crossing the Mississippi River in Hastings MN.
A pair of clean new rebuilds are tied down next to the nice depot in Hastings MN.
Two Soo Line GP38-2 pose near the depot at Hastings many winters ago.
Engineer Craig Willett is at the controls of F40PH No. 357 on Amtrak No. 8, the eastbound Empire Builder, at East Hastings, Minnesota, on November 9, 1992.