Norfolk Southern train 27A (Rutherford, PA-Atlanta, GA intermodal) rolls through the croplands eastbound on the NS Lurgan Branch through Lees Crossroads, PA.
An 800 series hopper train rumbles west through Shawsville, VA on thanksgiving morning.
Westbound empty coal train crosses the Susquehanna River on the Rockville Bridge. The Longest stone arch railroad viaduct ever built. The NS 4242 now a AC 44C6M was rebuilt from a C40-9W, NS 9035... (more)
A brand-new GE Wabtec AC44C6M rebuild locomotive. NS 4607 was originally built as NS D9-44CW 9386 in 1999.
A pair of AC44C6M’s pull empty grain NS 40N west through Shawsville.
Fresh GE rebuilds 4617 4605 4625 4604 @ Chattanooga .
NS 20E meets a "one-unit wonder" 11N at Bound Brook. Both units were rebuilt from older C44-9Ws.
U40-18 (Andover, VA. - Andover, VA.) heads East through Natural Tunnel State Park in Duffield, VA.
Norfolk Southern Train U40 is seen exiting the eastern portal of Natural Tunnel just outside of Duffield, VA., with 14 Coal Hoppers in tow.
Q196's train is eastbound on the fairly new double track built between Gainford and Fallis on CN's Edson Sub.
CN AC44C6M 3302 heads eastward away from the double track at Chip Lake.
Q196's train kicks up some fresh powder, eastbound on the main track at Peers operating at maximum allowable track speed.
Brand new CN AC44C6M 3308 leads Q180's train east on the south track of CN's Albreda Sub between Fitzwilliam and Yellowhead.
Q196 is at track speed approaching the west switch at Wildwood, AB.
CN AC44C6M 3302 has Q196's train well in hand as the moon looks on up above.