In 2007, the Gotthard line celebrated 125 years of operation. A steamtrain with locomotives A 3/5 (4-6-0) # 705 and C 5/6 (2-10-0) # 2978 is crossing the 54 meter high and 138 meter long Kärstele... (more)
Car transport train 27523 through the Lötschberg summit tunnel is leaving Kandersteg to Goppenstein, with leading cab car BDt # 956 and (not visible) rather worn out Re 4/4 # 179 (Re 425 # 179) s... (more)