SCFE Cane 2 crossing over an irrigation canal, pulling 20 empties bound for the Miami Locks loadout. Of note on Cane 2 this day was the classic power lashup, USSC 303, a 1958 built “Paducah rebu... (more)
SCFE Cane 2 creating a smokeshow as they notch up after dropping 25 empties at the Ritta 1 loadout, which is where the switch in the foreground leads to. Ritta is unique to the SCFE as it is the o... (more)
USSC Sugar Road Job 2 returning to Clewiston with 63 cane loads from loadouts around the Bryant area. Trailing DIT is USSC 407, which was picked up from Bryant Yard and swapped with other power. O... (more)
Sugar Road Job 2 outrunning the rain in the background towards Clewiston, pulling 20 loads for the mill. With the creation of the USSC mainline, it’s uncommon to see GP11’s running here, as th... (more)
Still wearing original Southern Pacific paint, HLCX 6341 continues to work in the cane fields of South Central Florida in 2024. Seen here pulling Sugar Road Job 5 on the USSC Mainline with 21 load... (more)