Loram rail grinder sits in the back track at Portage.
After a day of work the the Loram railgrinder takes a rest as a worker prepares to set the derail ahead of the units.
After spending most of the day working main track 3 between North Salt Lake and Salt Lake City, a Loram Rail Grinder slowly makes its way through Grant Tower, bound for Roper Yard to tie it down.
A Loram rail grinder douses sparks it left on its first pass of the big trestle at Ludlow.
The Loram crew prepares RG 318 for an overnight stay in Alderson, as Q303 heads West just after sundown.
Parked on a small siding behind Northern Pride Inc., a turkey processing facility, is one of Loram's L-Series light rail grinders - LRG 24. This particular set of grinding machinery is equiped wit... (more)
A light rain falls as a Loram rail grinder waits patiently to get back to work on the Pittsburgh Line. The grinder is stuffed into the spur for the Tribune-Democrat's newsprint warehouse next to t... (more)
The giant sleeps today. With the ability to dig 16 inches down, move 2000 tons of material per hour while traveling at working speeds of 2 m.p.h. and weighing in at a large 406,000 lbs. not to m... (more)
After a long winter of rock build-up that falls off the ore cars when loading and transporting the stuff lands between the rails and CN calls in the Loram RailVac to take care of the situation and... (more)
Fire and Ice. The Loram RG 309 works it's way down the CN Rainy Subdivision on a cold and frosty morning doing what it does best, grinding rail.
Loram rail grinder pays the Kanawha Sub one of its two yearly visits. Seen here working it's way east on number one track through Marmet.
A very interesting work vehicle.
Loram Rail Grinder at CP88 in Bethlehem PA
Loram rail grinder RG 314, make it’s way SB on FEC rails at mp 336+750 just north of Commercial Blvd. in Fort Lauderdale, FL