LS&I 2501,2302,2303 head up the 7AM Hill Job near Empire Jct. The Hill Job started the day with a trip to Tilden mine as no loads for the dock were available at Eagle Mills. While the train made a... (more)
LS&I 2401,2405,2400,2304 rumble over US-41 with 119 loads heading for the dock. Normal procedure was 3 units on the hill job, but a unit failure on the dock job has 2304 heading down to Marquette ... (more)
LS&I 2301, 2300, 2501 getting ready to depart Eagle Mills yard with the 2nd trip of the day to the docks. July 6, 1988 turned out to be a extremely hot day and as the afternoon progressed a number... (more)