Ore empties split the switch at 2nd street giving residents of Proctor a front row seat to the derailment cleanup, here RJ Corman tries to rerail the 201
Ore empties split the switch at 2nd street giving residents of Proctor a front row seat to the derailment cleanup, here RJ Corman rerails the 214
Ore empties split the switch at 2nd street giving residents of Proctor a front row seat to the derailment cleanup
A hot load of taconite prepares to leave United Taconite Zim production facility.
A steaming pile of fresh taconite leaves Utac's production plant for the short trip to duluth. I don't know why this crew has decided to leave a case of drinking water on the hood of their old wor... (more)
Limestone Loads headup the hill to Proctor Yard around Spirit Mountain Curve
Limestone Loads headup the hill to Proctor Yard
Pulling Limestone Loads from the Lakehead storage facilty
214 was getting a work out today. Here it is seen near Eveleth, MN.
Loaded and pulling hard.
On the way to the Sierra Pacific Mill in Burney, McCloud #37 has what would turn out to be the last empties to go to the mill. #37 is crossing over Highway 89 just North of Lake Brittan.
A trio of classic non-turbo Missabe SD38s roll south towards Proctor with ore loads from United Taocnite.
A trio of Missabe SD38s depart Dock 6 with a string of empties and begin their climb out of the Lake Superior Basin.
An empty ore train climbs out of the Lake Superior basin behind a trio of Missabe SD38s. A portion of Superior, Wisconsin can be seen in the distance.