Inspection train arriving Wylie yard in hot summer heat at 102 deg F. I would imagine this crew was probably sweating a lot with no AC in the cab of that GP38.
Thompson Canyon Tonnage A heavy eastbound CPKC manifest thunders upgrade along the Thompson River Canyon. The heavy eastbound manifest is set up 3x1 DPU x 1DPU for its assault on the Cana... (more)
Schreiber, ON to Sudbury, ON empty Herzog ballast train is tied down in the siding after dumping on the Heron Bay Sub and flipping at Schreiber and doing work at Terrace Bay lifting eight cars.
Train 26A works up the grade at Waco, Ga.
Train 26A works up the grade at Douglasville, Ga.
CPKC 101-17 eases down Neys hill and heads across the Little Pic River
CP 7020 pulls 101's train across the Pic River approaching Heron Bay
KCS ACe leading 261 passes the old searchlight at Cotter
Eastbound stacks head down the main track at Marathon
CPKC 112 approaches Marathon with a block of manifest upfront
CPKC 101-17 pulls up the grade at Coldwell with one of the five military themed locomotives on the point
CP SD70ACU 7020 + CP AC4400CW 9815 pull 101's train across the Pic River
CPKC 113 heads thru the Mink Tunnel
CP 421 eases into Heron Bay passing the shoulder cutter.
CP 113 passes the old yard for the pulp mill that once stood in the background along the lakeshore.