After setting out some engines from the Two Harbors ore pool and a few cars of interchange traffic at Keenan yard, DMIR 400 is headed back towards Two Harbors with some interchange cars.
ACWR's 600 crew slowly pulls out of Aberdeen after a direct handoff with CSX's G91116. With only two CSX GEs on the inbound consist, an SD40-3 pair was added for the hills on the way to Candor.